How long is required to obtain 100% sludge reduction?

In order to maintain the operational conditions of a wastewater plant avoiding “shocking conditions” the ideal duration to obtain 100% sludge reduction is 5 – 6 weeks. We have obtained immediate stoppage of excess sludge production but it is not recommended as it can cause high fluctuations of operational parameters due to high organic loading during the first week.